Wind Turbine Projects

2000
NEG Micon
Manufacture and fit-out of two 23m wind turbine blade moulds including steel support frame, micro-processor controlled surface heating elements, 3 phase electrical services, resin distribution system and vacuum services.
2001
NEG Micon
Manufacture and fit-out of two 31m wind turbine blade moulds including steel support frame, micro-processor controlled surface heating elements, 3 phase electrical and vacuum systems.
2001
NEG Micon
Manufacture of development plug and infused mould set.
2002
NEG Micon
Manufacture and fit-out of 31m wind turbine blade mould system including steel support frame, micro-processor controlled surface heating elements, 3 phase electrical and vacuum systems.
2002
NEG Micon
Manufacture and supply of 40m blade web sets.
2002
NEG Micon
Resurfacing of 26m blade mould and manufacturing assistance for 35m blade mould. Manufacture of ancillary root end and blade edge moulds for 40m blade mould.
2003
GE Wind
Infusion manufacture and supply of 37m blade web sets.
2003
NEG Micon
Supply of various composite and steel transportation cradles for blades. Structural stress and transport analysis of mould frames for blade moulds up to 40m in length.
2003
NEG Micon
Engineering, design and manufacture of hinges and turning mechanisms for blade moulds from 26m to 40m.