  • Ekofisk H0 & H60 Fire & Blast Walls and Escapeway Protection

    Date: 1993 – 2001 Products commissioned: ProTek® Fire and Blast Barriers (A60, H0 and H60 / up to 0.3 barg blast rating) Client: ConocoPhillips / Brown & Root Location: Greater Ekofisk Platforms Complex in the Norwegian North Sea     Customer requirement / problem Certified Hydrocarbon Fire (up to H60) and Blast (up to 0.3 barg; 30kN/m²) protection walls […]

  • Sløvåg Tank Farm Valve and Flange Covers

    Date: 2013 Supply of ProTek® Valve and Flange Covers for Sløvåg Tank Farm for hydrocarbon jet fire protection of 224 shutdown valves and neighbouring pipe flanges on 8 storage tanks. Products commissioned: ProTek® Valve & Flange Covers (J60 hydrocarbon jet fire protection) Client: Alexela Logistics AS Location: Sløvåg Tank Farm, near Bergen, Norway       Customer requirement / […]

  • Ellesmere Port LPG Storage Facility Valve Covers

    Date: 2013 Supply of ProTek® Valve Covers for Ellesmere Port LPG Storage Facility for hydrocarbon jet fire protection of 4 shutdown valves and diversion of leakage away from spherical LPG storage tanks Products commissioned: ProTek® Valve Covers (J60 hydrocarbon jet fire protection) Client: Avanti Gas Location: Ellesmere Port LPG Storage Facility, near Liverpool, UK       Customer requirement […]

  • St.Clair sur Epte Equipment Enclosures and Flange Covers

    Date: 2012 Supply of ProTek® Valve Enclosures and Flange Covers for St. Clair sur Epte gas storage facility delivering blast and hydrocarbon jet fire protection of 2 gas metering stations and 16 pipe flanges ranging from 6 inch to 24 inch diameter. Products commissioned: ProTek® Enclosures & Flange Covers (0.15barg blast and J30 hydrocarbon jet fire protection) […]

  • Freezer Module for Gullfaks Platform

    Date: 2011 A modular freezer construction for an offshore platform in Norway, comprising lightweight ProTek® panels fixed to structural pultrusions, which allowed SCS to deliver a low thermal conductivity with a U value of 0.2 W / m² ºC. Due to space limitations on the platform the walk-in freezer, which measures 7.5m long by 2m wide x […]

  • Edvard Greig Calorimeter Container

    Date: 2013 Supply of ProTek® panels for protection of 1 off Calorimeter against 0.5 barg explosion blast load. SCS was able to meet the requirement described above by supplying lightweight and rigid non-metallic ProTek® enclosure panels that met the structural requirements from NORSOK load cases for wave slam, blast and other environmental loads that were bolted […]

  • Yadana Subsidence Wave Protection Enclosures

    Date: 2013/2014 Supply Fabrications for Wave Protection of ESV / SDV & Control Box for Yadana Subsidence Project EPSC 2 Products commissioned: ProTek® Structural Composite Enclosures Client: TOTAL Myanmar/PT Gunanusa Location: Myanmar   Customer requirement/ problem Centennial wave slam protection enclosures for safety critical ESDV and BDV valves and associated equipment on 3 platforms Jet Fire and Blast protection […]

  • Åsgard A Fire & Blast Enclosures for Valve and Actuators

    Date: 2015 Supply of ProTek® Jet Fire & Blast Protection Fire Enclosures for Hang-offs, Valves and Actuators at Åsgard A Products commissioned: ProTek® Structural Composite Enclosures Client: Statoil/Aker Solutions Location: Haltenbank in the Norwegian Sea     Customer requirement/ problem Jet Fire and Blast protection required for Riser Hang-offs, Valves and Actuators Modifications required for newly installed platform equipment […]

  • Åsgard B Fire & Blast Enclosure & Cable Penetration Modifications

    Date: 2015 Supply of ProTek® Jet Fire & Blast Protection Fire Enclosure for Hang-off & Cable Penetration Modifications at Åsgard B Products commissioned: ProTek® Structural Composite Enclosures Client: Statoil/Aker Solutions Location: Haltenbank in the Norwegian Sea   Customer requirement/ problem Jet Fire and Blast protection required for Riser Hang-off Modifications of Existing Fire Enclosures required for newly installed platform […]

  • Åsgard A Fire & Blast Enclosures for Hang-off Umbilical

    Date: 2015 Supply of ProTek® Jet Fire & Blast Protection Fire Enclosure for Hang-off Umbilical at Åsgard A Products commissioned: ProTek® Structural Composite Enclosures Client: Statoil/Aker Solutions Location: Haltenbank in the Norwegian Sea     Customer requirement/ problem Jet Fire and Blast protection required for 1-off Hang-off Umbilical and ESD Valve Delivery to suit platform availability constraints Jet Fire […]