Date: 2011 A modular freezer construction for an offshore platform in Norway, comprising lightweight ProTek® panels fixed to structural pultrusions, which allowed SCS to deliver a […]
Date: 2013 Supply of ProTek® panels for protection of 1 off Calorimeter against 0.5 barg explosion blast load. SCS was able to meet the requirement […]
Date: 2013/2014 Supply Fabrications for Wave Protection of ESV / SDV & Control Box for Yadana Subsidence Project EPSC 2 Products commissioned: ProTek® Structural Composite Enclosures […]
Date: 2015 Supply of ProTek® Jet Fire & Blast Protection Fire Enclosures for Hang-offs, Valves and Actuators at Åsgard A Products commissioned: ProTek® Structural Composite Enclosures […]
Date: 2015 Supply of ProTek® Jet Fire & Blast Protection Fire Enclosure for Hang-off & Cable Penetration Modifications at Åsgard B Products commissioned: ProTek® Structural Composite […]
Date: 2015 Supply of ProTek® Jet Fire & Blast Protection Fire Enclosure for Hang-off Umbilical at Åsgard A Products commissioned: ProTek® Structural Composite Enclosures Client: Statoil/Aker Solutions […]
Date: 1993 – 2001 Products commissioned: ProTek® Fire and Blast Barriers (A60, H0 and H60 / up to 0.3 barg blast rating) Client: ConocoPhillips / Brown & […]